 |
 |
| |
 |
Client |
|
 |
Location |
|
 |
Synopsis |
|
| |
|
|
|
|
|
|
|
|
 |
|
| |
Manitowoc, WI |
|
 |
|
| |
The project for Bethany Lutheran Church included a complete renovation of the worship space, and an addition which increased the seating capacity of the Nave by 75%. This addition added transepts to the plan, changing the geometry from what was previously a long rectangle to that of a cross form, and thereby maximizing worshipper seating in close proximity to the Chancel and Altar. |
 |
|
|
 |
|
|
 |
|
| |
Green Bay, WI |
|
 |
|
| |
The design utilized the existing building to its full extent in order to reduce the amount of new construction. |
 |
|
|
 |
|
|
 |
|
| |
Ellison Bay, WI |
|
 |
|
| |
A new 16,675-SF worship and educational facility, which is the culmination of the merger of two Lutheran congregations. |
 |
|
|
 |
|
|
 |
|
| |
Flintville, WI |
|
 |
|
| |
A study of the need for new worship space resulted int he design of a 16,000-SF new church addition to seat 750 parishioners with an expanded seating capacity of 1,000. |
 |
|
|
 |
|
|
 |
|
| |
Oshkosh, WI |
|
 |
|
| |
A new 12,000-SF church with seating for 275 people and an educational facility, this suburban project replaced an older, urban campus. |
 |
|
|
 |
|
| © 2007 Somerville, Inc. |
 |
|
|
 |
|
|